Udemy

Construction Project Monitoring & Control

立即報名
  • 183 名學生
  • 更新於 7/2022
4.7
(50 個評分)
CTgoodjobs 嚴選優質課程,為職場人士提升競爭力。透過本站連結購買Udemy課程,本站將獲得推廣佣金,有助未來提供更多實用進修課程資訊給讀者。

課程資料

報名日期
全年招生
課程級別
學習模式
修業期
4 小時 48 分鐘
教學語言
英語
授課導師
Mohamed Elabbasy, Ph.D, PMP
評分
4.7
(50 個評分)

課程簡介

Construction Project Monitoring & Control

Measuring Work Progress, Earned Value Analysis (EVA), Schedule Updating, Project Crashing

Note: The course contents can be applicable to non-construction projects


Projects in general, and construction projects particularly, goes through different stages from their inception to their closeout. In the simplest terms, a typical project starts as a “concept” which develops with time going through different phases such as designing, bidding, procuring, executing, and closing. In the absence of applying a proper monitoring and control at each of these phases, one should not expect a successful project. WHY? Simply because construction projects are dynamic in nature. In construction, no project, almost, is executed as planned. For instance, changes are very likely to happen. Moreover, problems related to procurements, resource availability, productivity, financial acquisition, communications, quality, stakeholder engagements, etc. are common in construction project. Such factors can lead to delays in project completion and/or cost overruns.


Thus, to avoid or minimize such pitfalls, it is of extreme importance to apply adequate periodical monitoring and control to your project. “Monitoring” is comparing the project’s actual performance against its planned performance (i.e. baseline), while “Control” is taking preventive and corrective actions to bring the possibly deviated project back on track.


Accordingly, in this course, we will discuss and implement the common practices that are applied to project monitoring and control. The course is divided into five sections that are briefly described as follows:


Section (1): The different project monitoring and control processes (e.g. validate scope, control scope, control schedule, control cost, monitor communications, etc.) will be discussed along with their integration. In addition, a review of project scheduling (critical path method and precedence diagram) will be discussed with example as the project schedule is a crucial prerequisite for applying monitoring and control.


Section (2): The different methods that are commonly used to measure the percentage completion of each “activity” in your project will be discussed with examples. This is followed by understanding and implementing how the percentage completion of the entire “project” can be measured.


Section (3): Measuring the work progress (whether for each activity or the entire project as discussed in section 2) is an important input to apply what is known as “Earned Value Analysis” (EVA). EVA is an integrated time-cost approach that is used to monitor and analyze the project performance with respect to time and cost. Thus, in this section the main concept and objectives of EVA will be discussed. This is followed by understanding three important measures that are to be determined periodically and used to define the project performance. To define the project’s current performance and expected future performance, different analysis tools will then be discussed with examples (i.e. variance analysis, performance analysis, trend analysis, forecasting analysis, and reserve analysis). Finally, important practical concerns and consideration with respect to the validity of EVA will be discussed.


Section (4): Nothing can better represent your project's actual current and expected future time performance like updating your project schedule. Thus, in this section we will discuss the main types of information required and collected when preparing a report to apply schedule updating. This is followed by understanding how schedule updating is carried with applying different examples.


Section (5): The concept, uses, and methods of project crashing (or project acceleration) as a control tool will be discussed. We will understand that project crashing is not necessarily used only for project control, but it can be carried also for other purposes. One of the common analysis methods of project crashing is the “Time-Cost Tradeoff”, which will be also discussed with important practical considerations in this final section.


Best wishes and good luck.

課程章節

  • 5 個章節
  • 22 堂課
  • 第 1 章 SECTION (1): INTRODUCTION
  • 第 2 章 SECTION (2): MEASURING WORK PROGRESS
  • 第 3 章 SECTION (3): EARNED VALUE ANALYSIS (EVA)
  • 第 4 章 SECTION (4): SCHEDULE UPDATING
  • 第 5 章 SECTION (5): PROJECT CRASHING

課程內容

  • Project Monitoring and Control Processes
  • Critical Path Method and Precedence Diagram
  • Methods to measure the activities and entire project percentage of completion
  • Earned Value Analysis (EVA)
  • CV, CPI, SV, SPI, VAC, ETC, EAC, and TCPI (useful for PMP exam)
  • Variance Analysis
  • Performance Analysis
  • Forecasting Analysis
  • Trend Analysis
  • Reserve Analysis
  • Validity of EVA
  • Schedule Updating
  • Project Crashing (or acceleration)
  • Time-Cost Tradeoff


評價

  • T
    Tesilimi Oladimeji Yusuf
    5.0

    Nice intro. Very good starting video. Looking forward to seeing it this good at the end of the course.

  • J
    JABRANE Mehdi
    5.0

    Excellent content , thank you !

  • K
    Karlo Vinci A. Caballero
    5.0

    excellent

  • U
    Umendra Singh
    5.0

    Wonderfully crafted course and explained thoroughly with necessary examples. Will for sure implement many of the explained methods and techniques for better project management in future. Will be looking forward for similar course on Planning and Scheduling, Cost Management, Procurement Management. Thanks

立即關注瀏覽更多

本網站使用Cookies來改善您的瀏覽體驗,請確定您同意及接受我們的私隱政策使用條款才繼續瀏覽。

我已閱讀及同意