職業訓練局

SBS5221 PIPED SERVICES (MODULE FROM BACHELOR OF ENGINEERING (HONOURS) IN BUILDING SERVICES ENGINEERING) SBS5221 管道設備工程 (屋宇設備工程(榮譽)工學士之單元)

立即查詢

課程資料

課程級別
學習模式
地點
-

課程簡介

Assessment Methods / 評核方式
(A) Types of Assessments and their Weightings: (1) Laboratory work: 10% (2) Test: 10% (3) Project: 20% (4) Examination: 60% (B) Course Completion Requirements and CEF Reimbursement Requirements: (1) Attendance Requirement: 70% (2) Pass and achieve an overall grade at C (50%)

Entry Requirement / 入學要求
For Year 1 Entry : (1) For applying on the basis of the HKDSE results : Level 3 or above in the HKDSE English Language and Chinese Language; AND (2) Level 2 or above in the HKDSE Mathematics and one Elective Subject (must be Level 2 or above in the HKDSE Biology / Chemistry / Physics / Mathematics Extended Module 1 or 2); AND (3) an “Attained” in Citizenship and Social Development; OR Equivalent. [a maximum of two ApL subjects can be counted for admission purpose. Relevant ApL subjects include: Automotive Technology, Building Facilities Engineering, Building Technology, Aviation Studies, Electrical and Energy Engineering, Digital Construction, Constructing Smart Cities, Tech Basics and AI and Robotics.] [Applicants may be required to attend an interview.] For Year 3 Entry : (1) Higher Diploma OR equivalent sub-degree qualifications/studies in a relevant area of study.

Instructor's Qualifications / 導師資歷
(1) a recognised master’s degree, and preferably with teaching experience at tertiary level and/ or experience in professional practice in the relevant field; (2) good interpersonal and social skills; and (3) high proficiency in English and preferably in Chinese, including Putonghua.

QR Number / 資歷名冊登記號碼
15/000513/L5

QF Level / 資歷架構級別
5

CEF Registration Invalid From / 基金課程登記失效日期
01-SEP-29

課程內容

(1) Water Supply System: 6 hours (2) Application of Plumbing Design: 3 hours (3) Tank Sizing and Water Distribution Pipe Sizing: 3 hours (4) Pumps and Pump Selection: 6 hours (5) Hot Water Supply System: 6 hours (6) Application of Drainage Design: 3 hours (7) Sanitation and Drainage (Above and Below Ground): 6 hours (8) Sanitation and Drainage (Design): 3 hours (9) Sewage Treatment: 6 hours


立即關注瀏覽更多

本網站使用Cookies來改善您的瀏覽體驗,請確定您同意及接受我們的私隱政策使用條款才繼續瀏覽。

我已閱讀及同意