Course Information
Course Overview
Master Primavera P6 with a live project — learn planning, scheduling, resource management, baselines, and S-Curves.
Primavera P6 Professional – Complete Project Planning & Control (With Live Project)
Unlock the full power of Primavera P6 and become a confident planner who can manage real-world construction projects from start to finish.
This course takes you from project scheduling fundamentals to advanced control and reporting techniques — all demonstrated through a complete live residential project (10 Marla House).
Designed for engineers, planners, and students, this course blends theory + practical implementation, giving you hands-on skills exactly as used in the industry.
What You’ll Learn:
Master the Critical Path Method (CPM) and understand real scheduling logic.
Navigate and customize the Primavera P6 interface like a professional.
Build Enterprise & Organizational Breakdown Structures (E.P.S & O.B.S).
Create WBS, Activities, Calendars, and Milestones tailored to real projects.
Load Resources & Costs, and balance them using professional leveling tools.
Set Baselines, update progress, and monitor time–cost performance.
Generate Look-Ahead Schedules, Financial S-Curves, and Resource Histograms.
Apply Earned Value Management (EVM) for performance tracking.
Manage Procurement, Documents, and Overtime directly inside P6.
Work on a complete live project, from BOQ interpretation to final reporting.
Course Journey – Section Overview
Section 1 – Critical Path Method
Learn the foundation of project planning and how CPM drives every decision in Primavera P6.
Section 2 – User Interface
Understand the P6 environment, navigation, and customization for faster and smarter work.
Section 3 – Enterprise & Organizational Breakdown Structure
Build the enterprise and organization framework that supports multi-project control.
Section 4 – Calendars, WBS & Activities
Create project calendars, structure the WBS, define activities, and connect milestones for a complete schedule.
Section 5 – Creating & Assigning Resources
Learn resource loading, productivity calculation, and the importance of proper assignment.
Section 6 – Resource Leveling
Balance workloads using resource usage profiles and automatic leveling.
Section 7 – Updating & Monitoring
Create baselines, update progress, and prepare look-ahead schedules for management reporting.
Section 8 – Reporting
Generate accurate reports, import/export data, and prepare professional deliverables.
Section 9 – Material Procurement
Track materials, delivery timelines, and integrate procurement into your master schedule.
Section 10 – Advanced Topics
Master key features such as Global Change, Activity Codes, Duration Types, and Fast Tracking & Crashing.
Section 11 – Document Management & Overtime
Organize project documentation and plan overtime schedules effectively.
Section 12 – Roles, S-Curve & Resource Histogram
Assign roles, build financial S-Curves, and visualize manpower through histograms.
Section 13 – Earned Value Management (EVM)
Evaluate cost and schedule performance with real data using professional EVM techniques.
Section 14 – Cost Accounts & Progress Updation Using Steps
Learn cost tracking and staged progress updates for precise monitoring.
Section 15 – Project Kick-Off & BOQ Understanding
Start the live project by interpreting BOQ data and defining project scope.
Section 16 – Building WBS & Activity List in Excel
Develop a full WBS and activity list in Excel — the same way professionals plan before importing to P6.
Section 17 – Project Milestones & Duration Planning
Define project milestones and assign durations based on productivity analysis.
Section 18 – Creating the Project in Primavera P6
Build your Primavera P6 project file, set up WBS, and import all prepared activities.
Section 19 – Developing the Project Schedule
Establish logical relationships and define project milestones inside P6.
Section 20 – Resource & Cost Loading (Real Project Implementation)
Import BOQ costs, calculate budgeted units, assign resources, and resolve over-allocations.
Section 21 – Project Tracking, Baseline & Updating
Create a tracking sheet, assign baselines, and update real-time progress with cost data.
Section 22 – Project Reporting & Analysis
Generate look-ahead schedules, financial S-curves, and resource histograms using both Excel and Primavera.
Who This Course Is For
Civil / Construction / Planning Engineers
Project Managers & Site Coordinators
Students & Fresh Graduates seeking planning jobs
Anyone who wants to master Primavera P6 through a real-world project
Why Choose This Course
100 % Practical and Field-Oriented
Based on a complete live residential project
Includes practice files + PDF questions
Lifetime access & updates
Builds confidence to work in a real planning office environment
By the end of this course, you’ll be able to independently plan, schedule, monitor, and report any project using Primavera P6 — just like a professional planner in industry.
Enroll now and take your Primavera P6 skills from beginner to expert through a complete, step-by-step real project journey!
Course Content
- 10 section(s)
- 72 lecture(s)
- Section 1 Critical Path Method
- Section 2 User Interface
- Section 3 Enterprise And Organizational Breakdown Structure
- Section 4 Calendar,Project W.B.S And Activities
- Section 5 Creating And Assigning Resources
- Section 6 Resource Leveling
- Section 7 Updating And Monitoring
- Section 8 Reporting
- Section 9 Material Procurement
- Section 10 Some Important Topics
What You’ll Learn
- Understand the complete Primavera P6 interface and core project-management workflow.
- Build WBS, activities, and relationships to create a professional construction schedule.
- Master the Critical Path Method (CPM) to identify and manage key project timelines.
- Assign and manage labor, material, and cost resources with correct productivity rates.
- Create and manage Baselines to track project performance and delays.
- Perform Project Updating using real-world progress data and Excel tracking sheets.
- Generate and interpret Resource Histograms and Financial S-Curves.
- Apply Earned Value Management (EVM) for professional progress and cost analysis.
- Manage Procurement, Document Control, and Cost Accounts inside Primavera P6.
- Learn through a complete live project from start to final reporting.
Skills covered in this course
Reviews
-
SShafiullah Ibrahimi
It is very good and try to more update like plan academy and oracle primavera
-
RRaghu Rama Krishnan Manivannan
good and understandable
-
AAlaye Briggs
I think the course is complete and clearly and effectively explained
-
GGeorge Mortorff
Yes it is going to help me with using it for project management and scheduling of work