Udemy

Introduction to @RISK. Monte Carlo Simulation addin on Excel

立即報名
  • 967 名學生
  • 更新於 2/2020
4.0
(160 個評分)
CTgoodjobs 嚴選優質課程,為職場人士提升競爭力。透過本站連結購買Udemy課程,本站將獲得推廣佣金,有助未來提供更多實用進修課程資訊給讀者。

課程資料

報名日期
全年招生
課程級別
學習模式
修業期
1 小時 21 分鐘
教學語言
英語
授課導師
Fernando Hernandez
評分
4.0
(160 個評分)
2次瀏覽

課程簡介

Introduction to @RISK. Monte Carlo Simulation addin on Excel

Through a simple profit and loss forecast, the new user is introduced to @RISK, Excel's Monte Carlo simulation add-in.

This is an introductory course to @RISK (Palisade's Monte Carlo simulation software on top of Excel). You will learn how to set up, run a simulation and interpret results for any type of model.

We use an example of a simple business example: Joe runs a small contracting business repairing residential exteriors. We introduce the decisions he has to make. Step by step we explain how, by using @RISK, he is able to make sound and consistent decisions around his business.

Joe runs a small contracting business repairing residential exteriors. He and his two cousins working for him mainly contract on painting jobs, roofs repairs and landscaping. On average, he is able to service 8 monthly contracts during non-winter months and 4 monthly contracts during winter months, December to January. If there is an increase in demand, he can contract additional manpower at a higher, yet variable, hourly rate.

Preparing next year’s plan, he is considering the possibility of hiring a third fixed employee on payroll. This would allow him to increase his offer and eventually be able to service an average of 10 contracts during non-winter months. By doing this, he would be able to increase his total annual revenue by servicing more customers and decrease the expensive variable cost when he needs to subcontract additional manpower. However, during winter, he would be tolled by a higher fixed cost, probably making him run on losses during three consecutive months.

On the other hand, he is also considering downsizing his operations by excluding one of his cousins out of his payroll. With a downsized operation, he could only be able to handle an average of 7 service contracts per month on non-winter months. This would lighten up his fixed cost burden during the low activity winter months. He would be able to hire any required flexible manpower at a per hour basis. Evidently, this option could be less profitable but more secure and flexible.

課程章節

  • 4 個章節
  • 15 堂課
  • 第 1 章 Defining the model
  • 第 2 章 Defining the simulation
  • 第 3 章 Generating and Interpreting Results
  • 第 4 章 Advanced settings

課程內容

  • By the end of this course, you should be able to understand how @RISK works as a Monte Carlo simulation engine on top of Exceland set up a model on your own by inserting some basic distributions, running a simulation and interpreting basic graphs and information generated by it.


評價

  • N
    Nader Mohammad
    1.0

    Not meeting expectations and not related to projects budget and cost and plans

  • J
    Jamal Sondhi
    3.5

    Ok course, helpful that it starts with a basic scenario and P&L, but the lecturer could do with walking through his thinking as he dictates the formula you have to type into the template. Needless calling out of step numbers to sign post the videos are distracting.

  • M
    Melih Uğur Kondakçı
    4.5

    Yeterli olduğunu düşünüyorum. Temel verilmiş. Teşekkür ederiz.

  • R
    Ronald Williams
    5.0

    Very powerful program explained in detailed to a clear and easily understandable level.

立即關注瀏覽更多

本網站使用Cookies來改善您的瀏覽體驗,請確定您同意及接受我們的私隱政策使用條款才繼續瀏覽。

我已閱讀及同意